Pre-Installation of door hardware eliminates many of the typical on-site installation challenges while allowing the doors to be installed much later in the construction process, thereby minimizing damage to the doors. We encourage any and all constituents to visit the 10,000 square feet we’ve devoted to pre-installation. Seeing is truly believing!
“We will never purchase doors again without the hardware already installed.”
– Local Contractor purchasing doors at APV counter (October, 2023).
“We had no idea the doors would go up so fast. We had to adjust our schedule as APV was running over our other subs. We get it now.”
– GC Superintendent (April, 2024)
“The only thing I would have done differently is have the doors delivered later in the schedule. The speed of installation on site is remarkable.”
– GC Project Manager (August, 2024)
“After touring the APV facility and seeing how these doors are assembled, we will be purchasing all of our doors in the future with the hardware attached.”
– GC Superintendent (November, 2024)